About this Site
Create your own website today!
Update your website
Vote for this Site
Visit My Chat Room
Popular Popups
Jukebox
Message Board
Classified Ads
Statistics
Refer This Site
To A Friend
Home

FOREST PRODUCTS DIVISION
ABOUT FOREST PRODUCTS DIVISION
VENEER
PLYWOOD
FORESTRY AND LOGGING EQUIPMENT
HARDWOOD FLOORING
ABOUT HARDWOOD FLOORING
HARDWOOD SUBFLOOR SYSTEM
BRAZILLIAN HARDWOOD FLOORING
USA CANADA HARDWOOD FLOORING
AFRICAN HARDWOOD FLOORING
LOGS
ABOUT LOGS
NORTH AMERICAN LOGS
AFRICAN ROUND LOGS
LUMBER
ABOUT LUMBER
NORTH AMERICAN LUMBER
AFRICAN LUMBER
SAWMILLS
NEW SAWMILLS
USED SAWMILLS
HEAVY EQUIPMENT AND MACHINERY
USED HEAVY EQUIPMENTS
POWER PLANTS AND GENERATORS
NEW POWER PLANTS AND GENERATORS
USED POWER PLANTS AND GENERATORS
COMMODITIES AND MINERALS
COMMODITIES
SPECIFICATIONS
CHEMICALS AND PLASTICS
CHEMICALS
CONTRACT FORMS
LETTER OF INTENT FORM (LOI)




Generators and Power Plants
6 MW to 300 MW Gas Turbine,Steam Turbine,Waste to Energy Plants


  NEW! Poetry and Doll Maker with Galleries!     [Learn About Our Ecommerce]
Graphics Gallery!

GENERATORS AND POWER PLANTS IDEAL FOR OIL FIELDS, MINING, MANUFACTURING, FARMS
POWER PLANTS

6MW Power Plant


2 x GEC Ruston Generator Sets:

These 2 units are almost brand new , still some have warranty on them.
Original Cost over USD4,000,000.00 when installed.
Offered now for USD1,900,000

These units are currently running at 750 rpm and can be sped up to900 rpm to achieve 60Hz. These are the latest models on the market. These would be great units for oilfields or mining applications.
2 x GEC Alsthrom Ruston
2838 kw each
Diesel power generators comprising of:
2 x Ruston 12 vee type Cylinder Diesel Engines
Model 12RK270, Mark 2

With Napier type exhaust gas driven turbochargers.
2 x Leroy Sommer 2849kw. 3565 kva alternators
Type LSA56VL85/8P, 6600 volts, AC brushless type
GEC Alsthrom Engine Control and instrumentation Panels
Compressed air starting motors with 3 compare air compressors
Model 5213, 30.6 cfm each
Radiator Cooling system,charge air intake system, engine exhaust system, lubrication oil storage, waste oil storage, Alfa laval fuel/oil blending system
Rowater reverse osmosis plant
2 x weatherproof enclosures

HOURS
Unit 1: 3906 hours, 19745 total hours, fully rebuilt at 15839 hours, under warranty by GEC
Unit 2: 22052 total hrs, no rebuild yet



450 MW TURBINE GENERATOR PLANT (DIESEL) 50 Hz

6 x 25 MW Unit, 3 x 25 MW Unit, 9 x 25 MW Unit.
Manufacturer: VEB Bergmann - Borsig,Goritler Machinehau, Berlin
Design: Siemens
Capacity: 450 MW total (50Hz)
Comprising 18 - 25MW stand alone alternators and turbines.
Fuel: Heavy Oil: HE-B TOL 3367 Sulfur 4% or less Diesel Vanadium level must be inder 5ppm
Ash level must be under 200ppm fuel preparation: chemical and thermal
Fuel Use: Burning Energy: 9800 KCAL 9080 kg/hour
Water: 310 cubic meters/hour, entrance temp 34degreesC
Manning Level: 2 - 3
Total Weight: 380 tons/turbine (estimated)each
Generator Voltage: 10500V
Step up Transformer: 10000V to 100000V adjustable.
Built: 1979 & 1983
Operational: 2 years Hours: 2000
Warranties: no warranties
Efficiency: 97%
Includes: 3MW start up motor structural frame and housing
Specification: available for inspection at site
Spare Parts: 30 year guarantee on availiability
Required: RC Chimney: Top and bottom O.D. 8.8 meters Exhaust I.D> 8.0 meters Exhaust gas temp at entrance: 280 degrees C at exit 150 degrees C
Oil storage tanks RC pad.


307.5MW (50Hz.) STEAM TURBINE POWER PLANT

Turbine Data:
Power 307.5MW
Fresh Steam temperature 535C
Fresh Steam Pressure 186 bar
Hot reheat temperature 535C
Hot reheat pressure 42 bar

Generator data:
Power: 410 MVA;307.5MW
Voltage: 21kv
Frequency: 50hertz
Current: 11.272A

History: First power generation commenced in November 1986 and continued until final decommissioning in in October 1988. The unit supplied 2891000MWh to the system during that time. The total accumulated run time, including initial test runs is 16000 hours. Since decommissoning, the turbine has been immaculately maintained by the supplier. The operational bearings on the turbine unit were replaced by "storage/transport" bearings. The equipment is stored in a warm air warm atmosphere.
The price of this plant shall be provided on request exclusive any import duties which will be the buyers responsibility.The price includes delivery to port nearest buyers site and may include some installation, depending on buyers site condition/location.
Warranties are offered on equipment. The brand new price for this equipment was approximately US$95million.


SIX (6) 120 MW 50 Hz STEAM TURBINE GENERATORS
(Total 720MW)
Turbine: Horizontal,close coupled,tandem-compound,reheat,impulse type
Generator:
Two pole cylindrical rotor, driven at 3000rpm generates three phase alternating current a 50Hz. Hydrogen cooled.
Status: Dismantled, ready for shipment and installation. Boilers not included.
Hours
Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6
101052 102506 87631 83999 77921 72364


FOUR (4) 200 MW 50 Hz STEAM TURBINE GENERATORS
(Total 800MW)
Turbine: Horizontal,close coupled,tandem-compound,reheat,impulse type
Generator:
Two pole cylindrical rotor, driven at 3000rpm generates three phase alternating current a 50Hz. Hydrogen cooled
Status: Dismantled, raedy for shipment and installation. Boilers not included.
Hours:
Unit 1 Unit 2 Unit 3 Unit 4
86,946 84603 81499 75833


100 MEGAWATT BARGE MOUNTED POWER PLANT
Two (2) 50MW Gas Turbine Generators. ABS Certified
Outputs at ISO Conditions. These units will be refurbished and ready to operate on either natural gas or fuel oil and installed on an ABS certified barge. Delivery can occur within approximately 180 days after receipt of funds as specified below.

The two Gas turbines will be set up to operate singularly or in parallel.
The generator output will be 10800 volts, 3-phase, 50Hz. The power will be transported to shore by overhead transmission lines at Generator voltage. A control room will be provided together with switchgear and circuit disconnects. The customer/buyer will be responsible for providing all fuel needs including delivery and storage of fuel. The customer will also be responsible for all Grid connections and transformation of power. We will provide as part of the Barge package, an emergency generator for lighting and Barge pumps. The turbines can be started with electric motors powered
From the emergency generator (diesel fuelled) or by pressurized air.

Cost will be adjusted accordingly if additional equipment is required by customer.The two (2) Gas Turbines can be adapted to oprate on Heavy Fuel (HFO) or Bunker:C" or #6 Fuel oil, providing proper oil treatment modules are utilzed. We will offer this equipment under separate contract.


15.25 MEGAWATT POWER PLANT (15250kW)

Complet Power plant
Dual fuel
Consisting of Six(6) Worthington Reciprocating Engine Generators
Waste heat recovery.
Steam Turbine Generator

Plant Includes:
6 Worthington 2200 kW Generators
1 Each Worthington 1750 kW Generator
1 Each turbodyne 2500 kW Condensing Turbine
State of the Art Performance Monitoring and Data Collection System

4160V, 3 Phase, 60Hz cab converted to 3300V, 3 Phase, 50Hz
Step up primary transformer can be furnished
Plant designed with automation to allow operation and monitoring by one person.


LM 2500 GAS TURBINE POWER PLANT

G.E LM2500-PE (UPGRADED), NATURAL GAS, WATER INJECTION,
13.8 KV, 26500 KVA , TURBINE GENERATOR PACKAGE AS FOLLOWS:

1. ENGINE AND POWER TURBINE SECTION HAS BEEN COMPLETELY FACTORY REBUILT TO ZERO TIME AND WILL CARRY A ONE (1) YEAR FACTORY STANDARD G.E WARRANTY
2. GEAR BOX, GENERATOR SECTIONS HAVE A TOTAL OF 25,000 HOURS ON THEM AND WILL BE COMPLETELY REFURBISHED TO "AS NEW" CONDITION.
3. THE PROTECTION AND CONTROL SYSTEMS WILL BE REPLACED WITH CURRENT SOLID STATE SYSTEMS IN ACCORDANCE WITH THE REQUIREMENTS FOR A NEW INSTALLATION. THIS INCLUDES: VIBRATION SYSTEMS, GENERATOR PROTECTION, TURBINE START SYSTEMS, OPERATOR INTERFACE COMPONENTS AND POWER SYSTEMS, SYNCHRONIZATION SYSTEMS.
4. THE ENGINE AND POWER TURBINE SECTION WILL HAVE A ONE(1) YEAR WARRANTY IN ACCORDANCE WITH A STANDARD G.E WARRANTY AND THE REMAINDER OF THE MODULE WILL CARRY A ONE(1) WARRANTY BY RETA POWER AND IN ACCORDANCE WITH A STANDARD FACTORY WARRANTY FOR NEW EQUIPMENT OF THIS TYPE.



DIESEL ENGINE GENERATING STATION
EQUIPMENT FOR SALE OR PARTS

This diesel generating station was completed and put into operation at the end of 1995. The station has 9 diesel engines type 9TM620 manufactured by STORK-WARSILA DIESEL CO. HOLLAND
Single unit capacity of 12.75 MW;
9 matching generators type HSG1600S14 Manufactured by ABB, FINLAND with a single unit capacity of 12.43 MW.
The 9 sets were installed into 3 relatively independent units.

The 110kV switchyard is equipped with 3 main transformers 121kV/11kV 47 MVA type STROD/BTROD CL-2 manufactured by TAKAOKA ELECTRIC CO LTD. JAPAN. The 110kV GIS was manufactured by NISSAN ELECTRIC CO. LTD.JAPAN
The automation level is high since the on-line computer monitoring system is also controlling the substation. The power generation units have been extremely reliable since placed into operation. The annual consumption of oil (180cst heavy fuel oil) is 183g/kwh. The annual consumption of lube oil is 1.6g/kwh. The total operating hours are 2000-2500hrs

More information available on request.


7 MW WASTE TO ENERGY POWER PLANT 240 t per day, 50/60Hz

This plant was designed as mass burn combustor capable of combusting residential, commercial and light industrial wastes. The equipment is in excellent condition, a conclusion supported by the evaluation of an independently recognized third party engineer. Three other plants developed using the same technologies continue to prove the value of this technology.

KEY PLANT OPERATING SYSTEMS

7 MW ASEA BROWN BOVERIA VAX TURBINE AND TWO ZURN BOILERS. A summary of major plant components will be provided on request. The facility was constructed at the cost in excess of US$ 35 million. The facility was closed as a result of failed business decisions forcing the project into financial bankruptcy. The plant operatedfor less than 5000 hours. The facility was meticulously decommissioned to preserve the asset value and based on the expectations of the lender that it will resume operations. Included with the equipment are plans, specifications, as built drawings, operations manuals and detailed Air Impact Study conducted by the U.S Environmental Protection Agency which confirms the integrity of the design of the plant.



Sign Guestbook

View Guestbook

Bonwoode International Inc.
210-225 Donald Street
Ottawa Ontario K1L 8E2
Canada
1-613-316-3711
Fax 1-514-371-6580

bonwoode@yahoo.com

Domain Lookup
         www..
Get www.yourdomainofchoice.com for your site with services!




.

 
Any WordAll WordsExact Phrase
This SiteAll Sites
Visitors: 18416
Page Updated Thu Feb 19, 2004 5:19am EST